Washington DC-Manhole Repair
A 2-ft long segment manhole needed an emergency repair, which sat on a 78″ R.C.R sewer pipe. The fabrics were wrapped externally and use the wet layup installation method. Also, FRP anchors were installed to anchor the Manhole top to the base structure.